be parallel in this week's dry interior construction as well as the body shop installing electrical and heating / plumbing run.
Already at the end of the first day were all insulated ceilings + In some rooms already have the electrical boxes milled in the wall.
As can be seen on the pictures, the end of last week was also creates the Sohlenabklebung, that is the floors on the ground floor and basement have been glued with bitumen (diffusion barrier).
Insulation ceiling living / dining

insulation ceiling hallway

Electric raw installation and Sohlenabklebung



stairs to the attic