Thursday, September 16, 2010

How Do Various Plant Pigment Work

interior doors / flooring / sealing / pre-acceptance and blower-door test

were used earlier this week, interior doors, floor coverings created in the bedrooms, the baseboards installed and running the sealing of interior and exterior.

has taken place before yesterday, the blower door test to measure the air tightness of the house. The EU limit value for air-tightness of the house is 1.5. The experts at us from the measured value was only 0.7 - ie the house is twice as thick as per standard required!

was yesterday along with the construction manager and a neutral building experts are called in by the pre-acceptance of the house. Results: No major flaws. There were only listed a few little things within the next week until the final inspection at 23.09. remedy still are. For example: concrete pillars at the entrance are still missing, drainage for washing machine in the basement must be placed yet, a window is scratched and will be replaced, exterior lighting in the roof overhang is still missing, be heating instruction still needs etc.









0 comments:

Post a Comment