Final inspection & collection, gardening and landscaping until the end of 39th KW
On Thursday, 27.09. the final inspection has taken place. Intended for disposal Klenigkeiten in recent days largely done by Viebrock. Only the window with the small crack had to be ordered and will bsi to 05.10. replaced. The Bauschlösser were replaced with new locks, so now we only have access to our house.
Four days later, last Monday we have already moved into the new house ...
Our gala is farmhouse until the end of this week with his work on the terrace, the view of setting up a protection so busy. After that, the craftsmen tourism came to a halt for hopefully a long time ...
Tuesday, September 28, 2010
Tuesday, September 21, 2010
Examples Of Word Charts
Thursday, September 16, 2010
How Do Various Plant Pigment Work
interior doors / flooring / sealing / pre-acceptance and blower-door test
were used earlier this week, interior doors, floor coverings created in the bedrooms, the baseboards installed and running the sealing of interior and exterior.
has taken place before yesterday, the blower door test to measure the air tightness of the house. The EU limit value for air-tightness of the house is 1.5. The experts at us from the measured value was only 0.7 - ie the house is twice as thick as per standard required!
was yesterday along with the construction manager and a neutral building experts are called in by the pre-acceptance of the house. Results: No major flaws. There were only listed a few little things within the next week until the final inspection at 23.09. remedy still are. For example: concrete pillars at the entrance are still missing, drainage for washing machine in the basement must be placed yet, a window is scratched and will be replaced, exterior lighting in the roof overhang is still missing, be heating instruction still needs etc.
were used earlier this week, interior doors, floor coverings created in the bedrooms, the baseboards installed and running the sealing of interior and exterior.
has taken place before yesterday, the blower door test to measure the air tightness of the house. The EU limit value for air-tightness of the house is 1.5. The experts at us from the measured value was only 0.7 - ie the house is twice as thick as per standard required!
was yesterday along with the construction manager and a neutral building experts are called in by the pre-acceptance of the house. Results: No major flaws. There were only listed a few little things within the next week until the final inspection at 23.09. remedy still are. For example: concrete pillars at the entrance are still missing, drainage for washing machine in the basement must be placed yet, a window is scratched and will be replaced, exterior lighting in the roof overhang is still missing, be heating instruction still needs etc.









Tuesday, September 14, 2010
Different Wishing Well Sayings
Monday, September 6, 2010
Congrats On New Baby Card Wording
Thursday, September 2, 2010
Audi 3 Tdi Vs Jet Sport Wagon Tdi
Subscribe to:
Posts (Atom)