Ceiling Fan Remote On Dip Bcf

11th Day - Exterior walls

Now, on the walls of the ground floor has been started + already created the entire outer walls about 2.00 m in height. As we have learned of the evening, neighbors, tags over five hard-working masons were in use.

Northern view / input (17m long frontage)


view west


View southwest side patio


view south


view east

Tuesday, June 22, 2010

Blue Eyes And White Skin



Today we have the last sides . First, we have used glass to produce a highly reflective surface. Furthermore, We have a matte surface on Trespa panels laminated . Unfortunately, the attempts failed on a textured glass laminate to . Nevertheless, results in the only pins ln swept into a similarly haptic result. We have another problem of the assembly discussed. As the tread rubber does not stick lies in the radius (tried on the sample) and relatively expensive, we have now decided to screw . We finished this several templates to drill holes accurately perform. The side we envisaged 4 holes, diagonally to the cutting edge the die halves are placed. To fix, we take an screws because they are both cheap and stand out in white SSSR plastic version only slightly. The milled and post-mold / tool for deep drawing, we can supply last Tuesday after the company Chemnitz Kunex . After many hours of regrinding we hope that the first test cubes have become good. We are confident that we already hold this week, the first test cube in his hands.


milled and post-mold for thermoforming

Noisemakers At Cheer Competition

Baupause 9 days (to 29.06.2010)

According to information from our construction manager is currently no available Maurer team thing is that the next 9 days standstill on our site. On Wednesday, 30.06. It is further Go ...

Friday, June 18, 2010

Do Women Like Their Men Private Bits Bald

10th Day - Ground Floor sole

were now created the foundations and the ground-sole.

Tuesday, June 8, 2010

My Wireless Mouse Broke

Ready