Finally! The construction contract is signed after much back and forth. The 19% VAT've really still causes some sleepless nights but now we have all able to make a.
The detailed design is done, our fireplace is now half sunk in the staircase wall and we have through the wall of a shift now a wardrobe in the hall. The plans may We pick up tomorrow.
And it's hard to believe, but we have actually begun!
On 12th October was deported to the soil:
The detailed design is done, our fireplace is now half sunk in the staircase wall and we have through the wall of a shift now a wardrobe in the hall. The plans may We pick up tomorrow.
And it's hard to believe, but we have actually begun!
On 12th October was deported to the soil:
On 25th October was set the sump:
And today on 30th October , the excavator started digging our trench!
We were just locally, but unfortunately it was too dark. The excavator operator has somewhat surprised that we are not in the morning at the construction site and were making our first sod. He even found it a pity that many developers do not do that anymore. If we had known that today started, we would not let us take. Here is a photo of the excavation, even if it is a bit dark!