KfW 60 energy-saving house

We have so much of our house told, not only do we build a Kfw 60 energy saving house.


We favored a heat pump for heating, It was very close to build a KfW
60 house. We asked our contractor if it would be possible without much effort. He had the whole of his structural engineer / Heat Protection Officer by count, and lo and behold, there were not many extra costs. Our joint venture has so far had never built an energy efficient house and since the future always goes in that direction, he is now building our house as a "model house" and has adopted us as some of the additional costs. What are our neighbors now enjoy something, for he must bear it, not all costs, even if our neighbors can not Kfw 60 build house. That's it!

Here is a brief definition of what a Kfw 60 is energy efficient house:

  • After the funding of the Kreditanstalt für Wiederaufbau (KfW) is the standard, KfW energy saving house 60 achieved when the primary energy demand demonstrably not exceeding 60 kWh per m² floor space and year. This house type can be equipped with a conventional heating system. A ventilation system is usually not necessary. Due to the improved heat protection one for future energy price increases better equipped than the standard EnEV house.

Because we had chosen a different heating system than a normal gas boiler technology, we had only once through the whole mess to work through different heat pumps.

  • brine-water heat pumps are the most common type because they can be operated year-round because of the existing geothermal sufficient without additional heat source. acts as a heat transfer medium on the heat source side a water-antifreeze mixture (brine), which receives in a closed loop geothermal heat and emits through a heat exchanger to the refrigeration circuit of the heat pump . A heat exchanger between the heat source circuit and the heat pump can be omitted when using the so-called direct evaporation technique too. Here, the use of geothermal energy collectors installed horizontal copper tube, in which circulates the refrigerant from the heat pump. The advantage of this technology is to occur through the omission of a heat exchanger, less losses and a separate pump to drive the heat source circuit may be omitted, since this task is performed by the compressor unit of the heat pump. (Source WIB eV)
  • water-water heat pumps work because of year-round adequate existing (ground) water heat monovalent (ie, without additional heat source) and obtain the best performance figures for all types of heat pumps. As a heat transfer medium on the heat source side to function mostly groundwater in a Saugbrunnen constant at 8 - is encouraged 12 ° C and some of its heat in a heat exchanger sold to the cooling circuit of the heat pump . The cooled water then leaves the system via a return well. (Source WIB eV)
  • The air-water heat pump used for heating the surrounding air. The big advantage is that for this type of "heat supply" not a big effort has to be: the air we just sucked. Therefore, the acquisition is also cheaper than other heat pump systems. are air-water heat pumps for indoor and and outdoor installation. But both have in common that the ambient air drawn on a heat exchanger that is part of the refrigeration cycle is guided by the heat pump. On the heating circuit is a conventional, connected by water flowing through radiators or underfloor heating. Modern air-water heat pumps generally work to about -7 ° C alone and needing only at lower temperatures an additional heating, which usually consists of an electric heater. However, this additional heat source in our part of the very rare (a few days a year) for use . (Source WIB eV)
  • exhaust air heat pumps escape the heat source air and enter the recovered heat energy on to the same medium. Virtually every air conditioning unit can be described as air-air heat pump, where the benefits are, however, mostly for the active cooling of rooms. When you find the air heating / air heat pump for reheating of fresh air in mechanical ventilation systems. These devices are often referred to as a "building technology centers", "heat centers" or "heating centers". (If the heat pump is also responsible for heating of hot water, but you have to correct, by a combination of air-air and air-water heat pump .) Central ventilation systems talk about sucking air ducts used and moist air from bathroom and kitchen off. At a central location (such as utility room), a portion of the heat in the air is either fed directly to the evaporator of the air-air heat pump that heats the condenser side of the drawn in through the ventilation system fresh air. Often, these compact central heating systems are equipped with heat exchangers that provide a direct heat transfer from the ex-to fresh air, here we speak of ventilation with heat recovery. The heat pump has to overcome then only a small rise in temperature to provide space heating. The Conditioning blows this warm air then again through ventilation ducts in the living rooms. The power consumption of such heating systems is usually a few hundred watts to drive the refrigeration cycle of the heat pump and the fans for supply and exhaust air. The space required is about 1 m 2 area and about 2 m height. (Source WIB eV)
We have an exhaust air heat pump from the company Nibe (largest producer of heat pumps in Scandinavia) decided with underfloor heating. We should also heat the basement, we have even in the basement floor heating. This is cheaper, to join as a second heating circuit with low temperature radiators.
Moreover, it is far from being easy to find a suitable installer (or one who has ever needed to create a an offer ...). But that would be a topic for a separate thread.

Saturday, November 25, 2006

If Your A Scout Can You Wear A Stetson

measuring ... or? The basement

On Saturday 18 November 2006, we had an appointment in the morning with our Stairmakers Bönen. ( http://www.krebs-treppen.de/ ). He shows us the standard steps and it's not as bad as we thought at the beginning, since all the railings have almost no extra cost. However, have two handrails inside and we like that we have not. Over the next week we should get an offer for the stair railing with stainless steel barrel and-seek, and a range of wooden barrel. Andrew still wants to seek an alternative offer from the company four house. Let's see what we do later!

afternoon we went to the site. Yesterday, the basement ceiling molding within s and now we wanted to see if this, with our empty tubes and Styrofoam all out just as it should and behold, our joint venture is also working on Saturday! The first rows of our ground floor stand. not

Oh ... and our laundry chute is there where he hinsollte ... Or shall we say where we thought he hinmuss! He is now 30 cm away from the GWC wall and we had actually measured to fit in the corner! DA WE want! In the evening we made our thoughts and still desperately pondered about why this is so and now as we drill out the concrete floor again, aufmeißeln. I've been the most thought, as I had measured the whole thing and it fit but should. After much back and forth, we noticed that everything is all right. It would only fit in the corner, if we had not increased our shower and we both did not want to dispense with a large shower, we now have a column in the GWC with mosaic tiles .... or what we can think of a solution! At least we can live with this solution and there is a laundry chute!

Bronchitis 5 Year Old

Electrical

On Thursday 16 November 2006, we have for our basement electrical conduits installed. We have previously sat down with our electrician and a plan drawn out the raw space have to go . It looked quite wild out ...


But as long as our electrician knows what he has since recorded where we had to drill holes but that everything is perfect. At 10 clock we were on site and clock against 15 we were ready. Always takes the longest to set up the site, to all cables are where they need to and is cleared, the entire tool out of the car. After that was all very easy. At points we had to make the blanket on the Pitzen something, but otherwise everything went as we had imagined. It was quite funny because we haebn worked with the construction workers who had no vacation when we haebn the electrics made.
the wire for the garage, we put through a larger conduit. The father-extra has yet drilled through the casing so that the tube can be outside. For end we still had the styrofoam cut for ceiling diffusers (electrical, plumbing and heating).

After much back and forth, we have you yet found a place for our laundry chute. Now we have to make a window in the narrow floor. This has another advantage: we can now install a larger shower in the bathroom next to the laundry chute - now is André and happy again!

Monday, November 20, 2006

How Long Does Plan Stay In Womam System

pipe laying

On Wednesday, 16 November 2006 then should we move our electrical system for the basement.

Sun at 7 clock in the morning the phone rang our JV. Size: it is a problem with the stairs, he did not know how he does is to build our house, which certainly would not fit!

shock! How now? So if we are honest, we have made no worry about the stairs. Finally, our joint venture does not build his first house and our architects drew it the first house. The contractor has agreed with the stairwell Bauer a Terim for the afternoon, where we also attended a precaution.

When we arrived at noon to the site, came another shock! We should agree on the corner from noon filigree Fertigd , our Conduit Electrical can create for Keller. When we arrived were still blankets parts of our semi-detached house. What now? Our contractor was on site trailer and he told us that some fibers are pulled from the crane cable and must be repaired first before any further cover parts can be placed. Safety First! Since he happens to have law. Unfortunately the repair took a little longer than expected and meant that we had to postpone the planned pipe laying on the next day. We called first on both at work and asked for a further day's holiday. Finally, we should start the next day morning. Thank God - it was not a big problem. The contractor promised, however, that we could make the holes today, he would not make it with only the bottom reinforcement. We have therefore first called off all the helpers for the afternoon. At 15 clock

came the farmer and the stairs looked quite the contrary to our GU no problem with the stairs. He took a short redesign and was then also disappeared. We have identified a date for Saturday morning for sampling.

After good 2 hours we were finished with the holes. That is, the men have been characterized
and drilled and I'm with the wet vac the basement out quite dry. Then you have to sometimes even deserve a beer after work!

Friday, November 17, 2006

Should I Have A Brazilian

A poem ....

played with us for many considerations, of course, also the price involved, but more importantly, says the following poem:
from the cheapest and the best!
It is unwise to pay too much.
But there is worse to pay too little.
If you pay too much, you lose a little
Money - that's all.
If you pay too little you sometimes lose everything
.
Because what you bought
not in a position to do that,
was what it bought.
The law of equilibrium of the economy
forbidden to pay a little
To get a lot - this is not possible.
If you make but with the lowest provider
shops, it is advisable to turn over
something for the risk to go
you.
And if you do, you have enough to pay for something better
.


John Ruskin, 1829-1900

Zybt20-100 Dongle Drivers

Moving ahead!

The Cellar floor is finished and the walls have been poured .....

Since we have an individual plan has cursed our JV properly. It has actually lasted a whole day, until the first row of blocks has been set. I only say: "Good things take time!" Now the interior walls are finished!

view from the garden:


side view of the road:

to believe, is within 2 weeks of Keller.

On 10 November 2006, we have decided to clinker. At first it was quite tiring, but that day it went so fast. Our building area is already a house with a brick, has fallen to us all ... and the first time. After two phone calls to the building materials retailer, it was also clear. The clinker is more expensive than in our offer, but stock .. In short, we can order it!

Klampaert Classic - a Dutch in the WDF format! We have also found in Internet Under: http://www.daasbaksteen.nl/

On the Web is also some references! Now we need to agree only on a joint. It looks both very good ... whether light or dark .... we'll see how it will look at us then.

Sunday, November 5, 2006

Mount And Blade Mods Version 1.011

The cellar floor is poured!

On Friday 03 November 2006, poured our basement sole!


The concrete was supplied by the Heidelberg-mix plants. Hardly a car is off came the next ... It was really exciting.


It was not long since was the first half, which of our neighbors, ready!

So the bottom plate saw today, 05 November 2006 from.

morning to the Basement walls can be supplied. We would have liked to see, unfortunately we have to work both. Somehow, the house must be so paid. Maybe it creates my dad in the morning close a couple of photos! It's all so exciting !

Monday, October 30, 2006

How To Tune A Cobra 148f Gtl

Here we go ....

Finally! The construction contract is signed after much back and forth. The 19% VAT've really still causes some sleepless nights but now we have all able to make a.

The detailed design is done, our fireplace is now half sunk in the staircase wall and we have through the wall of a shift now a wardrobe in the hall. The plans may We pick up tomorrow.

And it's hard to believe, but we have actually begun!

On 12th October was deported to the soil:


On 25th October was set the sump:


And today on 30th October , the excavator started digging our trench!

We were just locally, but unfortunately it was too dark. The excavator operator has somewhat surprised that we are not in the morning at the construction site and were making our first sod. He even found it a pity that many developers do not do that anymore. If we had known that today started, we would not let us take. Here is a photo of the excavation, even if it is a bit dark!

Wednesday, August 16, 2006

Can Autistics Obtain Drivers License

signed building contract .......

After much back and forth we have finally signed our building contract on Monday, 14/08/2006.

We were assured that we can change our contract nor in respect of the sales tax increase. Currently stands in the construction contract a clause that clearly in our opinion, not quite is. Because we want as quickly as possible to start now, we've decided to trust our construction in this regard. But I have a very good feeling. Now we go first in the vacation for a week and hope that when we are back here with his calculations, the structural engineer is finished and we can order the basement.

Our friends ... and now neighbors are almost finished. Yesterday, the two had an appointment with a financial advisor and Monday have both the notary for the land. The planning application, which our contractors have filed 31.12.2005, can take the pair also, making them the home owner get even. Over the week, then made an amendment because they want to have a different layout of the house. We find this a good thing .... is also quite funny when days and nights of his dream realized from the house and then come neighbors (even if they are now friends) and take virtually the same house ... such as if there's one off the shelf! But that has now been resolved, too!!

Have a little time today in Google Earth rumgestöbert and fact, our construction area is also found. However, it seems there does not look it, as would be built there ..... it looked as earlier times of

Monday, July 31, 2006

What Types Of Shoes Do Raver Wear?

News .... :)

After all the trouble, we have sometimes good news.

Before our bank had given us the okay to do without neighbors, because good friends have struggled through this, but to rebuild. So we have for some days neighbors! Now it is still performed einwenig until they both have everything in the bag and then we hope that we can begin soon.

Next Saturday is topping out at friends who have started on time. When we are only so far: ( ... ? be

Tuesday, July 25, 2006

Mechanism Of Sibutramine

It will always put obstacles in the way! 25/06/2006

It can not just was!
It is full of euphoria .... entlich is the opening up over and you can start entlich!

OF REASON!
It all started, we have called the city to ask for something ... which we then explained that the city did not know that our developers built on the neighboring property.
What now? He does not build? What to do?? We were very shocked!
After we had an appointment with our building contractors, cleared the OK. What we knew but until then do not, or had it described to us otherwise. The next Hammer comb then even WHILE the meeting.
How do you want to start so early?
otherwise why should we want to know the earliest start date. Why should one be otherwise ready to finance and everything else to have done so far? Who wants to come as soon as only possible start with the construction? The answer of which was really a joke: "We thought you only wanted to know the date so!" HaHaHa ... if it were not so sad, because we can not now start first! The basement has a delivery time of 4 to 6 weeks.
But we give up hope!
Well then we construct containing the first in 6 weeks and only used a half! We thought!
It does not take long then we heard from our structural engineer, that if we build only one half, the values for a KfW60 House are not met. However, existing only so long until the second half. How sweet! We have received a loan from the KfW which has some prerequisites, so it comes to pay. So now we had to talk to our bank .....
there were all very nice and understanding. We had to set up a letter and then a single decision taken because such a case, previously never existed! So wait it said.
We thought the days of waiting never ends!
It had lasted only a week until we had a response from the bank, but it seemed to us like an eternity before. The Bank has no objection if the first is only half built. Yes, we can then start it soon. Maybe it will work out until the 31st August - would be nice!

It was also nice to be having trouble so we did not need that, after the release of building area and the official opening, no site power was available. Can you believe that?! There are 4 current distribution exist and RWE also donated cold drinks for the clients, as a small compensation.

We hope so because in front of our building as much topsy-turvy, then maybe it WHILE the construction phase, not too messy is! Would cease in the next few days some pictures, has already done much in the construction area.

Monday, June 26, 2006

My Daughter Has Low Self Esteem

Done!

believe it or not, ... but we actually had the weekend a letter in the mail, was in the:

"Official Construction 10/07/2006"

Yes we did it! Soon we see also that what is done;)

... then we will continue to blog more often News and disputes report! We are looking forward to anything crazy. Let's see how long that lasts .............





Friday, April 28, 2006

Custom Made Ear Gauges

Part

On Tuesday the time has come - with payment of the purchase price we are official property owner!

If the weather cooperates (and it is not raining puppies and kittens), we will probably anschmeißen on the following Saturday the grill and take one or two hops cold dish on its own soil to us.

By the way, one can certainly schonmal toast to good neighborhood ...

Thursday, March 16, 2006

Sinusoidal Function Word Problem

13th victory March 2006 for the coming forward?


There are now past 3 weeks since the groundbreaking ceremony and we had some days with ground frost. Despite all it looks in the construction area, as you work diligently:)


We remain optimistic: They will sort it out ..... and now here is our little cottage.



Wednesday, March 15, 2006

Where Can I Order Unsweetened Grapefruits

21st February 2006 Groundbreaking

entlich is it so far - the "first sod".

After the city so much time has left, was now finally starting to gain access. During a brief speech, the mayor and the head of the development company, has been named a date for the start of construction. Of course, with the proviso that everything goes off without a hitch:


15th July 2006 ..... We are excited!

The ceremony itself was unspectacular, except that there was not a spade and our mayor heralded the start of the excavator with a development measure.


But what are we to imagine at a groundbreaking ceremony. What the Baueuphorie so in a call for concepts from ..... Spade yourself ... containing a simple hole dug in the construction area .... a full scoop .... more, it is not so .....